Wacker Neuson Magazine
  • Wacker Neuson Website >
  • English
Select Page

Wacker Neuson Magazine

nav-en

  • zero emission
  • Worldwide
  • Brand

  • A completely emission-free construction site in Copenhagen

    A completely emission-free construction site in Copenhagen

    08.05.2020 | Worldwide, zero emission

    To lay new cables and, in doing so, interfere in the opening hours of shops in the pedestrian zone as little as possible – that was the city of Copenhagen’s task. For this reason, construction work was carried out predominantly at night or early in the morning. But how could this work without the noise level disturbing residents? The solution: only electrically operated and extremely quiet construction machines were used. A visit to a completely emission-free construction site.

    >>
  • Proper compaction – vibratory plates with compaction control

    Proper compaction – vibratory plates with compaction control

    28.04.2020 | Brand

    If new paving stones for the courtyard entrance or a new terrace are planned, good preparation is important. This applies particularly to the subsurface, as every building is only as good as the foundation it stands on. To keep the ground from collapsing after a brief time, vibratory plates are applied for compaction. But how do I carry out proper compaction? This is where vibratory plates with compaction control really come into their own.

    >>
  • Dual View Dumper excites in application

    Dual View Dumper excites in application

    20.02.2020 | Worldwide

    Loading, looking around, reversing, maneuvering, turning, driving forward, unloading and repeating everything again – this is what a typical work sequence when transporting material with a dumper on the construction site looks like. But how can this process be shortened and made easier? Wacker Neuson offers an innovative solution: the Dual View dumper. They are used by customers in a wide range of applications, including dike construction works in Northern Germany.

    >>
  • The emission-free Construction Site

    The emission-free Construction Site

    03.02.2020 | zero emission

    A construction site that generates little noise and where no exhaust fumes are produced – not only do most residents dream of these, but so do many end users who usually spend eight hours working on the construction site. But how far are we actually from the emission-free construction site?

    >>
  • Construction machines for booming business in South Africa

    Construction machines for booming business in South Africa

    31.01.2020 | Worldwide

    Save time and money with cost-efficient construction machines – customers of the rental company Catmech in South Africa know to appreciate this as much as reliability, versatility and user-friendliness. But not only that. Those who rent Wacker Neuson machines and equipment from “Catmech” also benefit from advantages that make life much easier.

    >>
  • Mini-excavator in demolition work

    Mini-excavator in demolition work

    29.01.2020 | Worldwide, zero emission

    Around 50,000 vehicles a day – 1,128 metres long – the highest bridge in Germany: we are talking about the Kocher viaduct close to Heilbronn. As part of its rehabilitation, demolition work was done in the interior of the box girder completely emission-free.

    >>
Next Entries »
  • Datenschutz
  • Impressum
  • Kontakt
  • Wacker Neuson Website