Wacker Neuson Magazine
  • Wacker Neuson Website >
  • English
    • Deutsch
Select Page

Wacker Neuson Magazine

nav-en

  • zero emission
  • Worldwide
  • Brand

  • Mega project in Hong Kong: Consultation in concrete technology by Wacker Neuson concrete solutions

    Mega project in Hong Kong: Consultation in concrete technology by Wacker Neuson concrete solutions

    02.12.2020 | Worldwide

    Accepting challenges, developing solutions and accompanying projects – the Wacker Neuson concrete specialists are involved in these tasks. This was also the case with a superlative project in Hong Kong: A gigantic road tunnel that will connect the city of Tuen Mun (area 40) with Chek Lap Kok airport on Lantau island. The tunnel is part of a major project for connecting the metropolitan area Hong Kong – Zuhai – Macao. Two tunnel tubes with four lanes are being constructed over a length of around five kilometers with the world’s largest tunnel boring machine. The work will take place up to 55 meters below the sea surface.

    >>
  • Datenschutz
  • Impressum
  • Kontakt
  • Wacker Neuson Website