Wacker Neuson Magazine
  • Wacker Neuson Website >
  • English
    • Deutsch
Select Page

Wacker Neuson Magazine

nav-en

  • zero emission
  • Worldwide
  • Brand

  • Emission-free demolition in medieval fortress

    Emission-free demolition in medieval fortress

    13.07.2020 | Worldwide, zero emission

    Breaking up concrete floors? No problem. And that in an underground vault? Challenging – but solvable. During the reconstruction of a part of the Rosenberg fortress in Kronach, Upper Franconia, only machines with compact dimensions that could be used in confined spaces and work without exhaust emissions were considered for this task. An ideal construction site for Wacker Neuson’s zero emission solutions.

    >>
  • Mini-excavator in demolition work

    Mini-excavator in demolition work

    29.01.2020 | Worldwide, zero emission

    Around 50,000 vehicles a day – 1,128 metres long – the highest bridge in Germany: we are talking about the Kocher viaduct close to Heilbronn. As part of its rehabilitation, demolition work was done in the interior of the box girder completely emission-free.

    >>
  • Datenschutz
  • Impressum
  • Kontakt
  • Wacker Neuson Website